NDAA-compliant drone survey in the USVI, and the file behind it.

Written for the person who has to justify the award. Compliant aircraft, a licensed surveyor of record signing the deliverables, operations under a written UAS flight SOP for this territory, and a proposal that states what it will do before you sign it.

Compliance

Why a cheaper bid can be ineligible.

If you already know what NDAA compliance means, skip ahead. If you are evaluating bids and the term has only ever appeared as a line on somebody’s capability sheet, this is the section that matters.

Federal money arrives with procurement conditions attached to it. Among those conditions are restrictions on unmanned aircraft manufactured by, or built with critical components from, a set of covered foreign entities. The restrictions began in defence procurement and have since been extended across federal agencies and, through funding conditions, into work paid for with federal dollars.

The consequence for a bid evaluation is blunt. This is not a scoring criterion where a strong showing elsewhere compensates. It is a threshold question about the equipment: either the aircraft is eligible for the work or it is not, and no price cures the second answer. A great deal of the drone hardware in general circulation — including much of what a low bid is likely to be flown on — falls on the wrong side of it.

Blue UAS is the Defense Innovation Unit’s list of platforms vetted against those requirements. It is the shortest defensible answer to “prove the aircraft is compliant”, because it is a published list maintained by the department that set the standard rather than a claim made by the vendor being evaluated.

DSS flies NDAA-compliant, Blue UAS listed aircraft. In a territory where a large share of the capital moving through construction is federal, that is not a badge on a brochure. It is the reason a file can be closed without a waiver conversation.

We do not name competitors or their equipment anywhere on this site. The question is whether the aircraft your project is flown on is eligible, which is a matter of record rather than opinion, and it is a fair question to put to every bidder including us.

/ Ask every bidder

Four questions that settle it

What is the aircraft?
Make and model, not “survey-grade UAV”. Eligibility attaches to the airframe
Is it on the Blue UAS list?
A published list, checkable without taking the bidder’s word for it
Will that aircraft fly this job?
A compliant aircraft in the fleet is not the same as the one that shows up
What happens if it changes?
Substitution mid-contract is where an eligible bid quietly stops being one

Put them to us as well. Our answer is the Skydio X10, on the list, and it is the aircraft that flies the work.

Licensure and oversight

Where a survey stops being drone output.

Anyone with a Part 107 certificate can produce a point cloud. What a reviewing agency needs is a deliverable somebody licensed has reviewed and put their name to.

The chain from field capture to a signed survey deliverable Four stages run left to right: field capture with control and check points, processing, quality control against check points withheld from the solution, and review and signature by the licensed surveyor of record. A bracket under the first two stages marks where unsigned drone output stops. A second bracket under all four marks what a signed survey deliverable includes. Field capture control + check points Processing photogrammetry,registration QC withheld check points Signed reviewed and signed unsigned drone output stops here what a signed survey deliverable includes engineering input arranged on scope
The gap between the two brackets is the whole argument. Both a survey firm and an operator can hand you the first two stages. Only one of them can hand you the fourth.
  • USVI-licensed surveyor of record. Survey deliverables are reviewed and signed. The licence is territorial, which matters: a mainland licence is not a substitute here.
  • Engineering input arranged on scope. Where a deliverable will be designed against rather than filed — a surface carrying a grading model, an as-built carrying a retrofit — professional engineering review is arranged as part of that scope and priced in the proposal.
  • Review, not rubber-stamping. The signature follows the QC step, not the processing step. That ordering is the entire value of it.
  • Accuracy reported, not asserted. Every survey deliverable ships with the check point residuals, so the reviewer accepts it on evidence.
/ For your file

How the oversight works

What is reviewed
The control, the check point residuals, and the deliverable measured against them
What is signed
Survey deliverables, by a USVI-licensed surveyor of record
What is not
Progress documentation and visual records. Dated and complete, but not survey products, and we do not present them as such
Engineering input
Arranged on scope where a deliverable will be designed against rather than filed
At proposal stage
The individual signing your deliverables is identified by name, licence and jurisdiction
Principal
Jerson Batista, President and Managing Member

Operations

Flown to a written procedure.

Every flight is conducted under FAA Part 107. Airspace authorization is obtained before a crew mobilizes rather than pursued on the day, which on this territory is a live constraint rather than a formality: Cyril E. King on St. Thomas and Henry E. Rohlsen on St. Croix both carry controlled surface areas that sit over a meaningful share of the developed ground. The island pages set out what that means locally — St. Thomas, St. Croix, and St. John, where the binding constraint is the ground rather than the airspace.

Operations run under a written UAS standard operating procedure maintained for this territory. It exists, it is followed, and it is available for review where a client or an agency asks to see it. We are not going to summarise its contents on a marketing page; a procedure paraphrased in sales copy is worth less than the document.

Equipment

What the work is done with.

Owned and operated, not hired in per job.

Aircraft, field instruments, and software, with what each is used for.
CategoryWhatUsed for
AircraftSkydio X10, RTKNDAA-compliant, Blue UAS listed aerial capture with an RTK-corrected position on every exposure
GNSSTrimble roversGround control and independent check points, set on the project coordinate system
Scanning total stationTrimble SX12Terrestrial scanning that measures and surveys from one setup, so the cloud lands on project control
Robotic total stationTrimble S7Control where canopy or multipath makes GNSS unreliable, and construction layout
Survey and design softwareCivil 3DSurfaces, volumes, corridors, and DWG or LandXML deliverables
BIM softwareRevitAs-built modelling at a stated LOD, and deviation against a design model
PhotogrammetryProcessing workstationsOrthomosaics, DSM and DTM surfaces, and registered point clouds

Coordinate systems and datums

Put this in the solicitation.

Most disputes about a delivered surface are not disputes about accuracy. They are disputes about what the numbers were referenced to, discovered after the fact, when re-projecting is the only remedy left and every re-projection is a chance to introduce a quiet error.

The fix costs nothing at procurement stage: specify the frame in the request. Four lines in a solicitation remove the entire category of problem, and any competent bidder can answer them. What the products themselves look like is covered under aerial mapping.

/ Specify these four

What to ask every bidder for

Horizontal datum and projection
Territory work commonly NAD83 / PR & VI State Plane, EPSG:32161
Vertical datum
VIVD09 where the project does not specify its own
Units
US survey feet
Accuracy, and how verified
A figure is worth little without the check point comparison behind it

Insurance and safety

Answered at proposal, not at mobilization.

DSS carries commercial insurance. The limits and the carrier are stated in the proposal and a certificate is available for your file.

If your solicitation carries specific requirements, put them in the request rather than leaving them to surface after award. They are cheap to answer beforehand and expensive to discover during execution, which is the same argument as specifying the datum.

/ Send with the RFP

What to put in the request

Minimum limits
Per occurrence and aggregate, as your contract requires them
Additional insured
Who needs to be named, and on which policies
Waiver of subrogation
Whether your contract calls for one
Certificate holder
The exact entity name and address the certificate must show

How we contract

What is in the proposal, and why.

This is the section that separates a firm from an operator. An operator quotes a day rate. A firm tells you in advance what it will hand over and holds itself to it.

Every DSS proposal states these five things. The right-hand column is what happens on jobs where they are left out.
The proposal statesWhich meansWhat goes wrong without it
ScopeThe site limits, what is captured, and what is notThe argument at delivery is about what was in the price, and nobody can settle it from the emails
Accuracy targetA stated figure and the method used to verify itA number is quoted with nothing behind it; the reviewer has no basis to accept or reject the surface
Deliverable formatsThe exact file types, named, and the software they open inA folder arrives that the civil team cannot attach, and conversion cost lands on the client
ScheduleDates for capture and for delivery, stated separatelyCapture is fast and modelling is slow, so a single date hides which one is the long pole
Fixed feeA price, not a rateThe invoice is a discovery. Day rates transfer scoping risk to the party least able to price it

A fixed-fee proposal comes back within one business day of the scoping call. Where a solicitation carries a written specification, the proposal answers it line by line rather than attaching a brochure and hoping. Start at contact, or read what the deliverables actually are on drone survey and scan to BIM.

For your vendor file

Capability statement.

A one-page PDF carrying the compliance position, licensure, equipment, coverage, and contact details, in the form a procurement file wants it. Ask and it will be sent.

Request the statement

Until the PDF is published, ask and it comes back by email the same day, along with anything specific your file needs — certificate of insurance, licence numbers, or the SOP.

Request the capability statement →

Procurement questions

The five we are asked before award.

Is DSS eligible for federally funded work?

On the aircraft question, which is the one that disqualifies bidders: yes. We fly NDAA-compliant, Blue UAS listed aircraft, under FAA Part 107, with a USVI-licensed surveyor of record signing the survey deliverables.

Whether a particular award is satisfied is determined by the awarding agency against that award’s own terms, and we are not going to answer for your contracting officer. What we will do is put the aircraft, the listing, the licence, and the insurance in front of them in whatever form they want it, before award rather than after.

Who signs the survey?

A USVI-licensed surveyor of record. That signature is the difference between a survey and a folder of drone output, and it is the thing a reviewing agency is actually looking for.

It is not a subcontracted signature applied to work nobody reviewed. The review follows the QC step and precedes the signature, and that ordering is the whole value of it. Where a deliverable will be designed against rather than filed, professional engineering review is arranged as part of that scope and identified in the proposal.

Are you insured?

Yes. The limits and the carrier are stated in the proposal, and a certificate is available for your file.

If your solicitation requires specific limits, an additional-insured endorsement, or a waiver of subrogation, put that in the request and it is answered at proposal rather than discovered during contract execution.

Can you deliver in our coordinate system?

Yes, and it should be in the solicitation rather than raised at delivery, because re-projecting a finished dataset is where quiet errors get introduced.

Name the horizontal datum and projection, the vertical datum, and the units, and the deliverable arrives on them. If the project runs on a site calibration, we hold the calibration. The product-side detail is on aerial mapping.

How do we contract you?

Send the site and what you need out the other end. A fixed-fee proposal comes back, usually within one business day of the scoping call.

The proposal states scope, accuracy target, deliverable formats, schedule, and fee, so there is a document to evaluate rather than a number to compare. If you are procuring against a written specification, send it and the proposal answers it line by line.

Tell us about the site.

Send the island, the parcel, and what you need out the other end. We’ll come back with a scoped, fixed-fee proposal within one business day.